Treavic Geosystems has successfully executed numerous Geotechnical, Geophysical, and Geospatial projects across Africa. Below is a summary of some of our major assignments — showcasing our commitment to technical excellence, safety, and environmental stewardship.
| Project | Country | Employer | Year | Description | Status |
|---|---|---|---|---|---|
| Geotechnical Site Investigations for the Proposed Kawa, Kambudji & Dikolongo Hydropower Project | DRC | Aurecon | 2020 | Boreholes, trial pits, bulk and undisturbed sampling, rotary core drilling, piezometer installation, and geotechnical reporting. | Ongoing |
| Geotechnical Site Investigations for the proposed Kiamburi Integrated Metro Village | Kenya | Within Foundation | 2019 | Boreholes (10–15m), laboratory testing, and geotechnical engineering report presentation. | Ongoing |
| Cone Penetration Test – Moi International Airport Slope Stabilization | Kenya | Asteriks Engineering Ltd | 2021 | In-situ CPTu tests (4 locations up to 15m) and geotechnical report preparation. | Complete |
| Lokichar–Lamu Crude Oil Pipeline (LLCOPP) | Kenya | Tullow Kenya B.V | 2018 | 200 boreholes, 410 trial pits, CPTu, plate load tests, piezometer installations, seismic hazard & resistivity surveys, and mapping. | Complete |
| Proposed Kipeto Wind Farm | Kenya | SMEC / WorleyParsons | 2018 | Boreholes, trial pits, plate load tests, seismic hazard evaluation, MASW surveys, and full reporting. | Complete |
| Mumbuluma Hydropower Project | Zambia | Aurecon | 2019 | Boreholes (10–40m), trial pits, rotary drilling, piezometers, and lab testing for foundation analysis. | Complete |
| Proposed Umba Dam | Kenya | EnviroPlan & Engineering Consult Ltd | 2018 | Boreholes, trial pits, permeability tests, piezometer installation, seismic hazard evaluation, and geological mapping. | Complete |